Logo

1,233,513 Meters OF MARINE BARRIERS AND COUNTING Live LIVE

Bolina Watercraft Safety Booms

Montefurado Hydropower Plant

Bolina Log Screen Booms

Case Study: Maintaining Power Generation at Hydropower Plant

Montefurado Hydroelectric Power Plant in Spain faced disruptions due to heavy debris accumulation on one side of the dam. This posed a risk to normal functioning, leading to maintenance downtime and reduced energy production. Excessive debris buildup affected power generation and water flow efficiency.

Hidroeléctrica de Cahora Bassa

Bolina Log Screen Booms

Case Study: Strengthening Operations at Hydropower Plant in Mozambique

Mozambique’s Hidroeléctrica de Cahora Bassa (HCB) hydropower plant faced operational issues with waterborne debris overwhelming the existing boom. Fluctuating water levels due to weather conditions increased debris, posing a threat to the critical installation by clogging intake screens and turbines.

River Trent

Bolina Watercraft Safety Booms

Case Study: Safeguarding the River Trent for Over 20 Years

The River Trent, a vital part of England’s history, faces challenges with flooding and hazardous navigation due to canals, weirs, and locks. The river’s unpredictable nature poses risks to both lives and properties, necessitating measures to enhance safety for various watercraft navigating its 188km stretch.

EcoCoast Our PHILOSOPHY

To be your turnkey partner throughout every stage of the marine barrier lifecycle, addressing your coastal and waterway challenges with a commitment to prioritizing performance, longevity and sustainability.


EcoCoast BOLINA-BOOMS RANGE

Get in touch with us today to learn more about our marine products and services! Our team is ready to assist you.